Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
F24F 11/30

for purposes related to the operation of the system, e.g. for safety or monitoring

Introduced: January 2018

Full Title

Control or safety arrangements > for purposes related to the operation of the system, e.g. for safety or monitoring

IPC and CPC are identically structured here. All 5 subcodes exist in both systems.

IPC defines codes here since 2018.

Child Classifications

Navigate with arrow keys, Enter to open

  • F24F 11/48 prior to normal operation, e.g. pre-heating or pre-cooling since 2018 IPC+CPC Available in IPC and CPC
  • F24F 11/49 ensuring correct operation, e.g. by trial operation or configuration checks since 2018 IPC+CPC Available in IPC and CPC