Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
F42D 1/06

Relative timing of multiple charges ( F42D1/055 take precedence)

Introduced: September 1968

Title

Titles differ between systems:

IPC: Relative timing of multiple charges

CPC: Relative timing of multiple charges ( F42D1/055 take precedence)

Full Title

Full titles differ between systems:

IPC:

Blasting methods or apparatus, e.g. for loading or tamping > Arrangements for ignition > Relative timing of multiple charges

CPC:

Blasting methods or apparatus, e.g. loading or tamping > Arrangements for ignition > Relative timing of multiple charges ( F42D1/055 take precedence)

No child classifications to compare. This is a leaf node in both IPC and CPC.