G06F 11/26 Functional testing
Introduced: January 1980
Full Title
Full titles differ between systems:
Error detection; Error correction; Monitoring > Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing > Functional testing
Error detection; Error correction; Monitoring (error detection, correction or monitoring in information storage based on relative movement between record carrier and transducer G11B20/18; monitoring, i.e. supervising the progress of recording or reproducing G11B27/36; in static stores G11C29/00) > Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing > Functional testing
Of 5 combined children, 4 exist in both systems.
1 codes are CPC-only extensions.
IPC defines codes here since 1995.
Child Classifications
Navigate with arrow keys, Enter to open
- G06F 11/263 Generation of test inputs, e.g. test vectors, patterns or sequences since 1995 +1 CPC IPC+CPC Available in IPC and CPC
- G06F 11/267 Reconfiguring circuits for testing, e.g. LSSD, partitioning since 1995 IPC+CPC Available in IPC and CPC
- G06F 11/273 Tester hardware, i.e. output processing circuits since 1995 +2 CPC IPC+CPC Available in IPC and CPC