DIFF Subgroup
H04L 43/02 Capturing of monitoring data
Introduced: January 2022
Full Title
Arrangements for monitoring or testing data switching networks > Capturing of monitoring data
IPC and CPC are identically structured here. All 3 subcodes exist in both systems.
IPC defines codes here since 2022.
Child Classifications
Navigate with arrow keys, Enter to open