DIFF Subgroup
H04L 43/08 Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
Introduced: January 2022
Full Title
Arrangements for monitoring or testing data switching networks > Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
IPC and CPC are identically structured here. All 5 subcodes exist in both systems.
IPC defines codes here since 2022.
Child Classifications
Navigate with arrow keys, Enter to open
- H04L 43/0876 Network utilisation, e.g. volume of load or congestion level since 2022 IPC+CPC Available in IPC and CPC
- H04L 43/091 Measuring contribution of individual network components to actual service level since 2022 IPC+CPC Available in IPC and CPC