IPC Subgroup
E01B 29/09 under, or from under, installed rails
Introduced: September 1968
Last revised: January 2006
Full Title
Laying, rebuilding, or taking-up tracks; Tools or machines therefor > Transporting, laying, removing, or renewing sleepers > under, or from under, installed rails
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- Subclass:
- PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
3 direct subcodes
Child Classifications
Navigate with arrow keys, Enter to open
- E01B 29/1 for inserting or removing sleepers
- E01B 29/13 for moving sleepers in a direction parallel to the rails, e.g. for spacing or aligning them
- E01B 29/14 for lifting sleepers up to the rails