E01B 29/09 under, or from under, installed rails
Full Title
Laying, rebuilding, or taking-up tracks; Tools or machines therefor (E01B27/00, E01B31/00 take precedence) > Transporting, laying, removing or renewing sleepers (E01B29/05 takes precedence; carrying devices B65G7/12) > under, or from under, installed rails
Filing statistics
CPC E01B 29/09 belongs to the parent subclass E01B, which recorded 21,234 patent applications worldwide between 2013 and 2023. Annual filings grew from 1,035 in 2013 to 1,523 in 2023 (+47%), peaking at 2,607 applications in 2020. The most active applicants in class E01 are PLASSER & THEURER EXPORT VON BAHNBAUMASCHINEN (998 applications), CATERPILLAR PAVING PRODUCTS (937 applications) and CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP COMPANY (869 applications).
Source: EPO PATSTAT, worldwide filings
3 direct subcodes
Child Classifications
Navigate with arrow keys, Enter to open
- E01B 29/10 for inserting or removing sleepers
- E01B 29/13 for moving sleepers in a direction parallel to the rails, e.g. for spacing or aligning them (E01B29/10 takes precedence)
- E01B 29/14 for lifting sleepers up to the rails (lifting devices in general B66F)
Top Applicants
Top 10 applicants by patent filingsfor class E01, 2013–2023, worldwide · Source: EPO PATSTAT
- PLASSER & THEURER EXPORT VON BAHNBAUMASCHINEN AT 998
- CATERPILLAR PAVING PRODUCTS US 937
- CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP COMPANY 869
- WIRTGEN DE 740
- CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP COMPANY 685
- CHANG AN UNIVERSITY 615
- CREEC (CHINA RAILWAY ERYUAN ENGINEERING GROUP) 613
- SOUTHEAST UNIVERSITY 562
- TONGJI UNIVERSITY 500
- ROAD & BRIDGE INTERNATIONAL COMPANY 491