Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
IPC Main Group
E01D 21/00

Methods or apparatus specially adapted for erecting or assembling bridges

Introduced: September 1968

Last revised: January 2006

Classification Context

Section:
FIXED CONSTRUCTIONS
Class:
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
Subclass:
BRIDGES

Related Keywords

CENTERING for bridgesFALSEWORK for bridges

3 direct subcodes

Child Classifications

Navigate with arrow keys, Enter to open

  • E01D 21/06 by translational movement of the bridge or bridge sections
  • E01D 21/08 by rotational movement of the bridge or bridge sections
  • E01D 21/1 Cantilevered erection