Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
IPC Subgroup
E01D 21/06

by translational movement of the bridge or bridge sections

Introduced: January 1995

Last revised: January 2006

Full Title

Methods or apparatus specially adapted for erecting or assembling bridges > by translational movement of the bridge or bridge sections

Classification Context

Section:
FIXED CONSTRUCTIONS
Class:
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
Subclass:
BRIDGES