IPC Subgroup
E02D 29/063 Tunnels submerged into, or built in, open water
Introduced: January 1995
Last revised: January 2006
Full Title
Underground or underwater structures; Retaining walls > Tunnels submerged into, or built in, open water
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING
- Subclass:
- FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
4 direct subcodes
Child Classifications
Navigate with arrow keys, Enter to open
- E02D 29/067 Floating tunnels; Submerged bridge-like tunnels, i.e. tunnels supported by piers or the like above the water-bed
- E02D 29/07 Tunnels or shuttering therefor preconstructed as a whole or continuously made, and moved into place on the water-bed, e.g. into a preformed trench
- E02D 29/073 Tunnels or shuttering therefor assembled from sections individually sunk onto, or laid on, the water-bed, e.g. in a preformed trench
- E02D 29/077 Tunnels at least partially built beneath the water-bed characterised by being made by methods involving disturbance thereof all along the location line, e.g. by cut-and-cover or caisson methods
Top Applicants
Top 10 applicants by patent filingsfor class E02, 2013–2023, worldwide · Source: EPO PATSTAT
- KOMATSU JP 3,549
- CATERPILLAR US 2,893
- HITACHI CONSTRUCTION MACHINERY COMPANY JP 2,390
- HITACHI CONSTRUCTION MACHINERY COMPANY 2,340
- POWERCHINA HUADONG ENGINEERING CORPORATION 2,336
- CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION 2,174
- SGCC(STATE GRID CORPORATION OF CHINA) 2,119
- HOHAI UNIVERSITY 1,821
- KOMATSU 1,775
- POWERCHINA GUIYANG ENGINEERING CORPORATION 1,725