Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
IPC Subgroup
E02D 29/07

Tunnels or shuttering therefor preconstructed as a whole or continuously made, and moved into place on the water-bed, e.g. into a preformed trench

Introduced: January 1995

Last revised: January 2006

Full Title

Underground or underwater structures; Retaining walls > Tunnels submerged into, or built in, open water > Tunnels or shuttering therefor preconstructed as a whole or continuously made, and moved into place on the water-bed, e.g. into a preformed trench

Classification Context

Section:
FIXED CONSTRUCTIONS
Class:
HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING
Subclass:
FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES