Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
E02D 29/07

Tunnels or shuttering therefor preconstructed as a whole or continuously made, and moved into place on the water-bed, e.g. into a preformed trench

Introduced: January 1995

Full Title

Full titles differ between systems:

IPC:

Underground or underwater structures; Retaining walls > Tunnels submerged into, or built in, open water > Tunnels or shuttering therefor preconstructed as a whole or continuously made, and moved into place on the water-bed, e.g. into a preformed trench

CPC:

underground or underwater structures (underground tanks B65D88/76; hydraulic engineering, e.g. sealings or joints, E02B; underground garages E04H6/00; underground air-raid shelters E04H9/12; burial vaults E04H13/00); Retaining walls > Tunnels submerged into, or built in, open water (construction or placing of caissons in general E02D23/00; joining caissons to each other under water, in general E02D25/00) > Tunnels or shuttering therefor preconstructed as a whole or continuously made, and moved into place on the water-bed, e.g. into a preformed trench

No child classifications to compare. This is a leaf node in both IPC and CPC.