E02D 7/28

Placing of hollow piles or mould-pipes by means arranged inside the piles or pipes

Introduced: September 1968

Last revised: January 2006

Full Title

Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds > Placing of hollow piles or mould-pipes by means arranged inside the piles or pipes

Classification Context

Section:
FIXED CONSTRUCTIONS
Class:
HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING
Subclass:
FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES