IPC Subgroup
E02D 7/28 Placing of hollow piles or mould-pipes by means arranged inside the piles or pipes
Introduced: September 1968
Last revised: January 2006
Full Title
Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds > Placing of hollow piles or mould-pipes by means arranged inside the piles or pipes
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING
- Subclass:
- FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
1 direct subcode
Child Classifications
Navigate with arrow keys, Enter to open
- E02D 7/3 by driving cores