IPC Main Group
E02D 7/00 Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds
Introduced: September 1968
Last revised: January 2006
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING
- Subclass:
- FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
Related Keywords
HAMMERS for pile-drivingpile-driving MONKEY(S)monkeys or tups for driving PILE(S)
7 direct subcodes
Child Classifications
Navigate with arrow keys, Enter to open
- E02D 7/02 Placing by driving
- E02D 7/18 Placing by vibrating
- E02D 7/2 Placing by pressure or pulling power
- E02D 7/22 Placing by screwing down
- E02D 7/24 Placing by using fluid jets
- E02D 7/26 Placing by using several means simultaneously
- E02D 7/28 Placing of hollow piles or mould-pipes by means arranged inside the piles or pipes