F03D 13/3 Commissioning, e.g. inspection, testing or final adjustment before releasing for production
Introduced: January 2016
Full Title
Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components > Commissioning, e.g. inspection, testing or final adjustment before releasing for production
Classification Context
- Section:
- MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- Class:
- MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- Subclass:
- WIND MOTORS
1 direct subcode
Child Classifications
Navigate with arrow keys, Enter to open
- F03D 13/35 Balancing static or dynamic imbalances