CPC Subgroup
E02D 29/077 Tunnels at least partially built beneath the water-bed characterised by being made by methods involving disturbance thereof all along the location line, e.g. by cut-and-cover or caisson methods
Full Title
underground or underwater structures (underground tanks B65D88/76; hydraulic engineering, e.g. sealings or joints, E02B; underground garages E04H6/00; underground air-raid shelters E04H9/12; burial vaults E04H13/00); Retaining walls > Tunnels submerged into, or built in, open water (construction or placing of caissons in general E02D23/00; joining caissons to each other under water, in general E02D25/00) > Tunnels at least partially built beneath the water-bed characterised by being made by methods involving disturbance thereof all along the location line, e.g. by cut-and-cover or caisson methods
Top Applicants
Top 10 applicants by patent filingsfor class E02, 2013–2023, worldwide · Source: EPO PATSTAT
- KOMATSU JP 3,939
- CATERPILLAR US 3,490
- HITACHI CONSTRUCTION MACHINERY COMPANY JP 2,553
- KOMATSU 1,789
- JOHN DEERE US 1,277
- HITACHI CONSTRUCTION MACHINERY COMPANY 1,102
- KOBELCO CONSTRUCTION MACHINERY COMPANY JP 1,014
- HOHAI UNIVERSITY 975
- CHINA MCC17 GROUP COMPANY 810
- VOLVO CONSTRUCTION EQUIPMENT SE 787