E02D 29/077 Tunnels at least partially built beneath the water-bed characterised by being made by methods involving disturbance thereof all along the location line, e.g. by cut-and-cover or caisson methods
Introduced: January 1995
Full Title
Full titles differ between systems:
Underground or underwater structures; Retaining walls > Tunnels submerged into, or built in, open water > Tunnels at least partially built beneath the water-bed characterised by being made by methods involving disturbance thereof all along the location line, e.g. by cut-and-cover or caisson methods
underground or underwater structures (underground tanks B65D88/76; hydraulic engineering, e.g. sealings or joints, E02B; underground garages E04H6/00; underground air-raid shelters E04H9/12; burial vaults E04H13/00); Retaining walls > Tunnels submerged into, or built in, open water (construction or placing of caissons in general E02D23/00; joining caissons to each other under water, in general E02D25/00) > Tunnels at least partially built beneath the water-bed characterised by being made by methods involving disturbance thereof all along the location line, e.g. by cut-and-cover or caisson methods
No child classifications to compare. This is a leaf node in both IPC and CPC.