E01B 27/12 Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
Introduced: September 1968
Full Title
Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers > Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
IPC and CPC are identically structured here. All 2 subcodes exist in both systems.
2 shared codes have differing titles between IPC and CPC.
Child Classifications
Navigate with arrow keys, Enter to open
- E01B 27/13 Packing sleepers, with or without concurrent work on the track (preforming ballast cores or seats for sleepers E01B27/02) IPC+CPC Available in IPC and CPC
- E01B 27/20 Compacting the material of the track-carrying ballastway, e.g. by vibrating the track, by surface vibrators (of trackless ballastway E01B27/02; for packing sleepers E01B27/12) IPC+CPC Available in IPC and CPC