IPC Subgroup
E01B 27/12 Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
Introduced: September 1968
Last revised: January 2006
Full Title
Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers > Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- Subclass:
- PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
Related Keywords
PACKING(S) railways sleepersRAMMING of ballast under railway sleepersTAMPING ballast under railway track
2 direct subcodes
Child Classifications
Navigate with arrow keys, Enter to open
- E01B 27/13 Packing sleepers, with or without concurrent work on the track
- E01B 27/2 Compacting the material of the track-carrying ballastway, e.g. by vibrating the track, by surface vibrators