Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
E02D 17/12

Back-filling of foundation trenches or ditches

Introduced: September 1968

Full Title

Full titles differ between systems:

IPC:

Excavations; Bordering of excavations; Making embankments > Foundation ditches or narrow shafts > Back-filling of foundation trenches or ditches

CPC:

Excavations; Bordering of excavations; Making embankments (soil-shifting apparatus E02F; earth drilling E21) > Foundation ditches or narrow shafts > Back-filling of foundation trenches or ditches

No child classifications to compare. This is a leaf node in both IPC and CPC.