Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
E02D 19/14

by freezing the soil (in connection with sinking shafts E21D1/12)

Introduced: September 1968

Title

Titles differ between systems:

IPC: by freezing the soil

CPC: by freezing the soil (in connection with sinking shafts E21D1/12)

Full Title

Full titles differ between systems:

IPC:

Keeping dry foundation sites or other areas in the ground > Restraining of underground water > by damming or interrupting the passage of underground water > by freezing the soil

CPC:

Keeping dry foundation sites or other areas in the ground (sheet piles or bulkheads E02D5/02) > Restraining of underground water > by damming or interrupting the passage of underground water > by freezing the soil (in connection with sinking shafts E21D1/12)

No child classifications to compare. This is a leaf node in both IPC and CPC.