DIFF Main Group
E02D 7/00 Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds (for both placing and removing E02D11/00; )
Introduced: September 1968
Title
Titles differ between systems:
IPC: Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds
CPC: Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds (for both placing and removing E02D11/00; )
Full Title
Full titles differ between systems:
IPC:
Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds
CPC:
Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds (for both placing and removing E02D11/00; )
IPC and CPC are identically structured here. All 7 subcodes exist in both systems.
1 shared codes have differing titles between IPC and CPC.
Child Classifications
Navigate with arrow keys, Enter to open
- E02D 7/28 Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes IPC+CPC Available in IPC and CPC