Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Main Group
E02D 7/00

Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds (for both placing and removing E02D11/00; )

Introduced: September 1968

Title

Titles differ between systems:

IPC: Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds

CPC: Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds (for both placing and removing E02D11/00; )

Full Title

Full titles differ between systems:

IPC:

Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds

CPC:

Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds (for both placing and removing E02D11/00; )

IPC and CPC are identically structured here. All 7 subcodes exist in both systems.

1 shared codes have differing titles between IPC and CPC.

Child Classifications

Navigate with arrow keys, Enter to open

  • E02D 7/18 Placing by vibrating IPC+CPC Available in IPC and CPC
  • E02D 7/20 Placing by pressure or pulling power IPC+CPC Available in IPC and CPC
  • E02D 7/22 Placing by screwing down IPC+CPC Available in IPC and CPC
  • E02D 7/24 Placing by using fluid jets IPC+CPC Available in IPC and CPC
  • E02D 7/26 Placing by using several means simultaneously IPC+CPC Available in IPC and CPC