DIFF Subgroup
E02D 9/04 by cutting-off under water
Introduced: September 1968
Full Title
Full titles differ between systems:
IPC:
Removing sheet pile bulkheads, piles, mould-pipes, or other moulds > by cutting-off under water
CPC:
Removing sheet piles bulkheads, piles, mould-pipes or other moulds (for both placing and removing E02D11/00) > by cutting-off under water
No child classifications to compare. This is a leaf node in both IPC and CPC.