IPC Subgroup
E02D 9/04 by cutting-off under water
Introduced: September 1968
Last revised: January 2006
Full Title
Removing sheet pile bulkheads, piles, mould-pipes, or other moulds > by cutting-off under water
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING
- Subclass:
- FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES