DIFF Subgroup
E04B 9/22 Connection of slabs, sheets or the like to the supporting construction
Introduced: January 1990
Full Title
Full titles differ between systems:
IPC:
Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation > Connection of slabs, sheets or the like to the supporting construction
CPC:
Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation (ceilings used as forms for making floors E04B5/00; coverings or linings for ceilings E04F13/00) > Connection of slabs, sheets or the like to the supporting construction
Of 3 combined children, 2 exist in both systems.
1 codes are CPC-only extensions.
1 shared codes have differing titles between IPC and CPC.
IPC defines codes here since 1990.
Child Classifications
Navigate with arrow keys, Enter to open
- E04B 9/24 with the slabs, sheets or the like positioned on , or held against horizontal flanges of the supporting construction since 1990 +4 CPC IPC+CPC Available in IPC and CPC
- E04B 9/28 with the slabs, sheets or the like having grooves engaging with horizontal flanges of the supporting construction or accessory means connected thereto since 1990 IPC+CPC Available in IPC and CPC