E04B 9/24 with the slabs, sheets or the like positioned on , or held against horizontal flanges of the supporting construction
Introduced: January 1990
Title
Titles differ between systems:
IPC: with the slabs, sheets or the like positioned on, or held against, horizontal flanges of the supporting construction
CPC: with the slabs, sheets or the like positioned on , or held against horizontal flanges of the supporting construction
Full Title
Full titles differ between systems:
Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation > Connection of slabs, sheets or the like to the supporting construction > with the slabs, sheets or the like positioned on, or held against, horizontal flanges of the supporting construction
Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation (ceilings used as forms for making floors E04B5/00; coverings or linings for ceilings E04F13/00) > Connection of slabs, sheets or the like to the supporting construction > with the slabs, sheets or the like positioned on , or held against horizontal flanges of the supporting construction
CPC subdivides this area 5x more granularly than IPC with 4 additional codes.
4 codes are CPC-only extensions.
IPC defines codes here since 1990.
Child Classifications
Navigate with arrow keys, Enter to open
- E04B 9/26 by means of snap action of elastically deformable elements since 1990 IPC+CPC Available in IPC and CPC