DIFF Main Group
E04G 13/00 Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies
Introduced: September 1968
Title
Titles differ between systems:
IPC: Falsework, forms or shutterings for particular parts of buildings, e.g. stairs, steps, cornices or balconies
CPC: Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies
Full Title
Full titles differ between systems:
IPC:
Falsework, forms or shutterings for particular parts of buildings, e.g. stairs, steps, cornices or balconies
CPC:
Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies
IPC and CPC are identically structured here. All 3 subcodes exist in both systems.
1 shared codes have differing titles between IPC and CPC.
Child Classifications
Navigate with arrow keys, Enter to open
- E04G 13/02 for columns or like pillars; Special tying or clamping means therefor +3 CPC IPC+CPC Available in IPC and CPC
- E04G 13/04 for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor ( members, e.g. consoles, for attachment to the wall E04G17/16) IPC+CPC Available in IPC and CPC
- E04G 13/06 for stairs, steps, cornices, balconies, or other parts corbelled out of the wall +4 CPC IPC+CPC Available in IPC and CPC