Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
E04G 23/06

Separating, lifting, removing of buildings; Making a new sub-structure

Introduced: September 1968

Full Title

Full titles differ between systems:

IPC:

Working measures on existing buildings > Separating, lifting, removing of buildings; Making a new sub-structure

CPC:

Working measures on existing buildings, (; on foundations E02D35/00, E02D37/00; in connection with insulations E04B; subsequent or finishing work E04F) > Separating, lifting, removing of buildings; Making a new sub-structure

Of 1 combined children, 0 exist in both systems.

1 codes are CPC-only extensions.

Child Classifications

Navigate with arrow keys, Enter to open