Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
IPC Main Group
E01B 27/00

Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers

Introduced: September 1968

Last revised: January 2006

Classification Context

Section:
FIXED CONSTRUCTIONS
Class:
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
Subclass:
PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS

Related Keywords

BALLAST ways for railwaysDISTRIBUTION of ballast for railwaysLAYING of rail trackslaying TRACK(S) for railways or tramways

4 direct subcodes

Child Classifications

Navigate with arrow keys, Enter to open

  • E01B 27/02 Placing the ballast; Making the ballastway; Redistributing ballasting material; Machines or devices therefor; Levelling means
  • E01B 27/04 Removing the ballast; Machines therefor, whether or not additionally adapted for taking-up ballast