Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
IPC Subgroup
E01B 27/06

Renewing or cleaning the ballast , with or without concurrent work on the track

Introduced: September 1968

Last revised: January 2006

Full Title

Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers > Renewing or cleaning the ballast , with or without concurrent work on the track

Classification Context

Section:
FIXED CONSTRUCTIONS
Class:
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
Subclass:
PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS

3 direct subcodes

Child Classifications

Navigate with arrow keys, Enter to open

  • E01B 27/08 the track having been taken-up
  • E01B 27/1 without taking-up the track
  • E01B 27/11 combined with concurrent renewal of track components