IPC Main Group
E02D 9/00 Removing sheet pile bulkheads, piles, mould-pipes, or other moulds
Introduced: September 1968
Last revised: January 2006
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING
- Subclass:
- FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
2 direct subcodes
Child Classifications
Navigate with arrow keys, Enter to open