E04G 11/12 of elements and beams (E04G11/18 takes precedence)
Introduced: September 1968
Title
Titles differ between systems:
IPC: of elements and beams
CPC: of elements and beams (E04G11/18 takes precedence)
Full Title
Full titles differ between systems:
Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs > for walls, e.g. curved > Forms which are completely dismantled after setting of the concrete and re-built for the next pouring > of elements and beams
Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs > for walls, e.g. curved (E04G11/04 takes precedence) > Forms, which are completely dismantled after setting of the concrete and re-built for next pouring (; connecting or supporting means for forms E04G17/00; ) > of elements and beams (E04G11/18 takes precedence)
IPC and CPC are identically structured here. All 2 subcodes exist in both systems.
1 shared codes have differing titles between IPC and CPC.
Child Classifications
Navigate with arrow keys, Enter to open
- E04G 11/14 with beams arranged in alignment with and between the elements IPC+CPC Available in IPC and CPC