E04G 11/16 with beams placed within the wall
Introduced: September 1968
Full Title
Full titles differ between systems:
Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs > for walls, e.g. curved > Forms which are completely dismantled after setting of the concrete and re-built for the next pouring > of elements and beams > with beams placed within the wall
Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs > for walls, e.g. curved (E04G11/04 takes precedence) > Forms, which are completely dismantled after setting of the concrete and re-built for next pouring (; connecting or supporting means for forms E04G17/00; ) > of elements and beams (E04G11/18 takes precedence) > with beams placed within the wall
No child classifications to compare. This is a leaf node in both IPC and CPC.
Top Applicants
Top Applicants (IPC)
Class E04,2013–2023, worldwide · Source: EPO PATSTAT
- CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION 6,575
- ZHEJIANG YASHA DECORATION COMPANY 4,488
- SGCC(STATE GRID CORPORATION OF CHINA) 4,427
- CHINA CONSTRUCTION SECOND ENGINEERING BUREAU 4,352
- CHINA MCC17 GROUP COMPANY 3,122
- GOLD MANTIS FINE DECORATION TECHNOLOGY (SUZHOU) COMPANY 2,605
- SHENYANG JIANZHU UNIVERSITY 2,420
- CHINA CONSTRUCTION SEVENTH ENGINEERING DIVISION COMPANY 2,284
- CHINA CONSTRUCTION FIFTH ENGINEERING DIVISION CORPORATION 2,008
- CHINA CONSTRUCTION FIRST BUILDING (GROUP) CORPORATION 1,967
Top Applicants (CPC)
Class E04,2013–2023, worldwide · Source: EPO PATSTAT
- CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION 1,675
- CHINA MCC17 GROUP COMPANY 1,593
- ZHEJIANG YASHA DECORATION COMPANY 1,551
- SGCC(STATE GRID CORPORATION OF CHINA) 1,297
- GOLD MANTIS FINE DECORATION TECHNOLOGY (SUZHOU) COMPANY 1,212
- SHENYANG JIANZHU UNIVERSITY 926
- VAELINGE INNOVATION SE 901
- CHINA MCC5 GROUP CORPORATION 894
- VKR HOLDING DK 854
- SHANGHAI BAOYE GROUP CORPORATION 753