E04G 11/14 with beams arranged in alignment with and between the elements
Introduced: September 1968
Title
Titles differ between systems:
IPC: with beams arranged in alignment with, and between the, elements
CPC: with beams arranged in alignment with and between the elements
Full Title
Full titles differ between systems:
Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs > for walls, e.g. curved > Forms which are completely dismantled after setting of the concrete and re-built for the next pouring > of elements and beams > with beams arranged in alignment with, and between the, elements
Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs > for walls, e.g. curved (E04G11/04 takes precedence) > Forms, which are completely dismantled after setting of the concrete and re-built for next pouring (; connecting or supporting means for forms E04G17/00; ) > of elements and beams (E04G11/18 takes precedence) > with beams arranged in alignment with and between the elements
No child classifications to compare. This is a leaf node in both IPC and CPC.