Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
E04G 11/14

with beams arranged in alignment with and between the elements

Introduced: September 1968

Title

Titles differ between systems:

IPC: with beams arranged in alignment with, and between the, elements

CPC: with beams arranged in alignment with and between the elements

Full Title

Full titles differ between systems:

IPC:

Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs > for walls, e.g. curved > Forms which are completely dismantled after setting of the concrete and re-built for the next pouring > of elements and beams > with beams arranged in alignment with, and between the, elements

CPC:

Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs > for walls, e.g. curved (E04G11/04 takes precedence) > Forms, which are completely dismantled after setting of the concrete and re-built for next pouring (; connecting or supporting means for forms E04G17/00; ) > of elements and beams (E04G11/18 takes precedence) > with beams arranged in alignment with and between the elements

No child classifications to compare. This is a leaf node in both IPC and CPC.